Inner City Bypass Expansion

Principle – Ventia (Brisbane City Council)
Completion Date – January 2017

Project Scope: Environmental Engineering and Design, Project Management, PUP Network Design and Investigations, Engineering Support.

The work involved hydro excavating six jet fan exhaust pits into the ICB tunnel under challenging conditions. This required a schedule of two stages totalling an allowed 5 days for completion. Owing to the tight schedule, it was necessary to minimise material transport and disposal activities, therefore a retention basin was designed and built to temporarily store the hydro excavated mud to minimise transport time. This also allowed for evaporation which reduced the volume of debris transported to land fill. The potential of adverse environmental impact was minimised by use of the retention basin, resulting in evaporation and 110 tonnes of soil being recycled as general land fill.

Related Posts

Lorem ipsum, dolor sit amet consectetur adipisicing elit. Deleniti, aut! Iure repellat at sed, omnis officiis magni, quibusdam in esse quas provident eveniet officia distinctio, iste dolor cum nulla alias!

Call 02 6687 2880 now for a free quote

Liquid Waste Management services in Lismore, Ballina, Byron, Kyogle, and Richmond Valley council areas.

Talk to Us